Here enclosed some suggestions!
People rely on clothing, walls are mounted on cloth, wall coverings are very beautiful, if it is equipped with excellent construction, it will better show the beauty of wall coverings, and reasonable construction can make the service life of seamless wall coverings reach more than 10 years. Let me tell you the summary of installation workers from ONEW with years of experience.
The temperature should be between 15℃-25℃, and the humidity should be below 85%. Avoid construction during the rainy season or weather fusion season.
Water-resistant walls and latex paint walls (different base film materials) can be covered with wall coverings. When base film is painted, carefully check the wall surface and it is fine if the wall is with uniform white. Besides, keep the corners vertical and ensure the wall flat.
The wall with white powder is not allowed for wallpaper installation.
Check whether the seamless wall covering is flawed before construction, and both sides need to be carefully inspected. For cold glue construction, environmentally friendly glutinous rice glue should be used; latex paint walls need to use wall base treasure to replace the general base film. If the base film is matched with glue, the effect will be better.
Adjust glue (cold glue wall covering): According to the product proportioning instructions, add water in batches and stir until the rice is paste-like. Leave it for about half an hour. If it becomes thinner, add a little more glue powder. Put chopstickers in the container, if they don’t tilt, the concentration will be fine.
Roll the wall covering glue from a certain shaded corner of the wall, and generally press the roll to brush a wall (roll up and down evenly) and then start to stick the wall covering. The wall covering glue should not be applied too much or too thick, which will easily lead to the problem of glue overflow on the wall.
Straighten the wall covering along the wall, and the height of the upper side is the same as the height of the wall. At the lower end, use an object to padded the whole roll of wall covering on the top of the skirting line.
Roll out the wall cloth and use a scraper to scrape the wall cloth on the wall, the order is from the inside to the side, the wall cloth is pasted up and down, and then continue to pave in order.
Door and window sockets: the position of the switch socket should be laid and cut and reserved. If the socket switch has been installed, two diagonal lines can be cut from the center point, and 4 small triangles will appear, and then use a scraper to press around the switch socket , Use a utility knife to cut off the excess wall covering.
Non woven wallper/ Self adhesive fabric/ Pvc wallpaper/ mural/ framless arts/ custom wallpaper with your own designs/ large images stock available/ samples can be available/ online Installtion support/ Advanced production lines.
Email: Bela@beautywall.com.cn
Whatsapp: 0086 17802585196